3 research outputs found

    Research for Global Coordinating Method of Large Equipment Scheduling in Construction Site

    Get PDF
    Much energy is dissipated when large equipment moves slowly. Generally, equipment scheduling at construction site is supposed to minimize equipment slowdown and deadhead moving. Table methods are always adopted to optimize transfer sequence, but the feasible solution is well disappointing. For the acceptable solution relevant to task points in construction equipment scheduling, transfer table is divided into four regions. After proper augmentation and deflation, the acceptable solution evolves into global coordinating solution of construction scheduling, which contributes to minimizing slowdown and deadhead mileages. This method has been verified in practical engineering and is a significant reference on decision making of construction equipment scheduling

    An Orderly Untangling Model against Arching Effect in Emergency Evacuation Based on Equilibrium Partition of Crowd

    Get PDF
    To untangle the arching effect of a crowd as much as possible in emergency evacuations, we employ a theoretical model of equilibrium partition of crowd batch. Based on the shortest time arrangement of evacuation, the crowd is divided into appropriate batches according to the occupied time of evacuation channel in order to determine the occupant number of every evacuation passageway. The number of each batch crowd is calculated under the condition that the time of entering the evacuation passageway is equal to the time of crossing over the evacuation passageway. Subsequently, the shortest processing time (SPT) rule establishes the evacuation order of each batch. Taking a canteen of China Three Gorges University as a background, we obtain the waiting time from the first person to the last one entering the evacuation channel in every batch by simulation. This research utilizes data from simulations to observe an untangling process against the arching effect based on the SPT rule. More specifically, evacuation time only lasts for 180.1 s in order and is 1.6 s longer than that in disorder, but the arching effect disappears. Policy recommendations are offered to improve the evacuation scheme in disaster operations
    corecore